This project from Queensland Rail entails a total of 49 rail bridge structures that will be repaired and replaced within 9 months. The total length of this project is stretched across 700 kilometres. The design chosen by VEC allowed a crew of just 7 workers using 2 excavators to remove the old timber rail bridge and replace it with the new bridge or culvert in just 48 hours.

The Project

There were many challenges involved in this particular project, including but not limited to:

  • Logistics with 49 Sites, spanning 700 km’s between Emerald, Winton and Clermont;
  • Plant and Equipment, mobilisation, maintenance and suitability;
  • Precast Elements fabrication in Rockhampton, and delivery on program;
  • Materials, procurement from quarries and concrete suppliers and the procurement of consumables;
  • Personnel, recruitment, accommodation, transportation, and OH&S.

Two solutions were designed to complement the site specific
requirements:

  1. Removal of the existing timber bridge structure and replace with a precast concrete bridge structure.
  2. Removal of the existing timber bridge structure and replace with a precast concrete culvert structure.

VEC had to create an innovative design that met the design elements, including client standard specifications, site specific selections, construction duration, availability of materials and plant selection.

To enable the team to do this, extensive planning and programming was required before works started onsite. Many aspects needed to be carefully planned and thought through, including but not limited to:

  • the Critical Path Network for the programming;
  • scheduling and coordinating of bids for closures;
  • procurement scheduling and coordination with suppliers; and
  • a detailed planning for our Human Resources, recruitment, accommodation and travel.

This was then all tailored to the project specific requirements to ensure a successful delivery of the project.

Health, Safety, the Environment and Quality also played a vital role throughout the project. VEC had a dedicated HSEQ coordinator onsite through the duration of the project who ensured that all the HSEQ requirements were fulfilled.

The collaborative approach together with the Client, Queensland Rail, is essential to the success of this project. VEC’s innovation and the dedicated team work from the crews have resulted in the successful delivery of the repair and replacement of the Queensland Rail Timber Bridges in Central West Queensland.

Head Office

10b Industrial Dr, Ulverstone,
TAS 7315

PO Box 812
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112

Hobart Office

Level 3, 116 Bathurst Street
Hobart, TAS 7000

PO Box 812
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112

Melbourne Office

Level 10, 567 Collins Street, 
Melbourne, VIC 3000

PO Box 812 
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 (03) 9278 5100
Fax +61 3 6425 6112

Queensland Office

2 Burke Street,
Woolloongabba, QLD 4102

PO Box 812 
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112