Wielangta Road Bridges (x4)

ClientDepartment of Primary Industries, Parks, Water and Environment - Parks and Wildlife Service
Value$1.41M
StateTasmania
CompletedJune 2017

This project entailed the Design and Construction of 4 dual lane plank bridges to reinstate access between Tasmania’s East coast and Tasman Peninsula tourism road to replace flood damaged timber structures.

The Project

This project entailed the design and construction of four bridges on Wielangta Road Department of Primary Industries, Parks, Water and Environment (DPIPWE).

Innovation

The design and construction of these smaller-sized bridges fall within VEC’s core capabilities. The innovation on this project was clearly the use of the mass block retaining structure. This meant that safety innovations were achieved by eliminated working at height by building the wall incrementally and back filling as the wall was built.

By having an experience piling and foundation crew on site, the VEC team were able to deliver the project successfully for the DPIPWE.

Head Office

10b Industrial Dr, Ulverstone,
TAS 7315

PO Box 812
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112

Hobart Office

Level 3, 116 Bathurst Street
Hobart, TAS 7000

PO Box 812
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112

Melbourne Office

Level 10, 567 Collins Street, 
Melbourne, VIC 3000

PO Box 812 
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 (03) 9278 5100
Fax +61 3 6425 6112

Queensland Office

135 Coronation Drive
Milton, QLD 4064

PO Box 812 
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112