Projects

With over 20 years of experience, VEC has designed, constructed and rehabilitated many structures across Australia. By using the search function, you can search for projects under each category and/or location. Alternatively, chose the specific capability or location that you are searching to see a list of associated projects.
Project Profiles are available to download. These sheets will provide additional information in relation to the project selected.

The Macquarie Island Modernisation Project

The Australian Government, through the Department of Environment and Energy’s Australian Antarctic Division, own and operate the research station on Macquarie Island, in a cooperative arrangement with the Tasmanian Government. For more information, visit: https://modernisationproject.com.au/

The Perth Link Roads Project

The Perth Link Roads Project is designed to improve safety and efficiency by removing heavy vehicles from the centre of Perth as they travel to and from the northern and north-western ports. For more information, visit: https://tasperthlink.com.au/

VEC Project Contract Management Plans

To access the portal for VEC Contract Management Plans, please click on the following link: VEC CMP's

While VEC strive for perfection, it is inevitable that challenges will occur on some projects. Our reputation for superior capability comes from our success in overcoming any challenges through innovative design, clever engineering and practical thinking.
Header Image

Blayney Shire Council - Timber Bridge Replacements (6x)

ClientBlayney Shire Council
Value$2.3M
StateNew South Wales
CompletedDecember 2017

Outstanding client engagement by VEC’s design and onsite teams allowed this project to circumvent onsite issues. This lead to the project being delivered significantly ahead of schedule.

The Project

The Design and Construction to replace six deteriorated load limited timber bridges with concrete structures, including installing bridge barriers and approach guardrail. Furthermore, the project included the demolition of the existing bridge structures, with two of the new bridges requiring construction of new road alignments built by the client in parallel with the bridge replacements.

The structures are reinforced concrete, providing a 100 year design life, SM1600 design loads, and NSW RMS (D&C) Specifications. With design specific to each location, VEC fabricated the precast concrete components in our Ulverstone precast facility, and the structural steel in our workshop and these were then transported to site. Works were completed 6 months earlier than the contract completion date.

 

Head Office

10b Industrial Dr, Ulverstone,
TAS 7315

PO Box 812
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112

Hobart Office

Level 3, 116 Bathurst Street
Hobart, TAS 7000

PO Box 812
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112

Melbourne Office

Level 10, 567 Collins Street, 
Melbourne, VIC 3000

PO Box 812 
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 (03) 9278 5100
Fax +61 3 6425 6112

Queensland Office

135 Coronation Drive
Milton, QLD 4064

PO Box 812 
Ulverstone, TAS 7315
info@vec.com.au

Phone +61 3 6425 6530
Fax +61 3 6425 6112